PIPELINE WEBINAR EPISODE 8: Criss-Crossing the Capital Beltway
Join us as GeoEngineers Senior Construction Consultant Gary Castleberry and representatives from Dominion Energy (owner) and Michels Corporation (contractor) discuss a recent project where the Direct Pipe® trenchless installation method was selected for a 230kV electrical transmission line installation beneath I-66, I-495, and the Washington Metropolitan Area Transit Authority railroad in Fairfax County, Virginia. The presenters will share insights on how the Direct Pipe® method reduced the risk of inadvertent drilling fluid returns and settlement to overlying highway and bridge infrastructure.
Presenter: Gary Castleberry, MS, Senior Construction Consultant
Special Guests: Matthew Rudd (Dominion Energy) and Tucker Toelke (Michels Corporation)
Moderator: Jon Robison, PE, Principal Engineer/Pipelines Discipline Leader
The webinar will be on June 13, 2023 at 1:00 PM (CST). RSVP for the free webinar using this form, and visit our Pipeline Webinar Page for previously recorded webinars in the series and information about upcoming sessions.
Have a webinar topic you’d like for us to discuss? Let us know by contacting April Smith with your idea.